WATER & LIGHT DEPARTMENT
CITY OF EAST GRAND FORKS
GENERAL INFORMATION
This information is updated as changes are made. However, confirmation of current rates should be requested from the business office, call 218-773-1163 during business hours.
Temporary Electric Service
Temporary Electric Service(120/240 Volt Single Phase) $40.00
Temporary Electric Pole Set $25.00
Temporary Electric Service Other Than Above Cost
New Resident Deposits
Non-Electric Heat $50.00
Electric Heat $150.00
Electric Rates
Residential Electric 6.90¢/kWh
All Electric 6.90¢/kWh
Off-Peak 3.5¢/kWh
Small Commercial 6.9¢/kWh
Large Commercial Ask Office personnel about this rate if your business uses over 100,000 kWh per month.
Electric Fixed Charges
Residential Electric $7.75/month fixed charge
All Electric $7.75/month fixed charge
Off-Peak $5.75/month fixed charge
Small Commercial $9.75/month fixed charge
Large Commercial Ask Office personnel about this rate if your business uses over 100,000 kWh per month.
Water Rates
All usage is billed @ $4.75 per thousand (1000) gallons
Water Fixed Charges
5/8" meter $7.00 per month
3/4" meter $7.00 per month
1" meter $11.25 per month
1 ½" meter $22.50 per month
2" meter $36.00 per month
3" meter $67.50 per month
4" meter $111.25 per month
6" meter $225.00 per month
8" ,eter $352.00 per month
over 8" the Department decides
Water Service Connection Fee
3/4" regular meter $120.00
1" regular meter $152.00
1 ½" regular meter $350.00
2" regular meter $490.00
2" compound meter and larger call for price
Residential Sewage Rates
½ of your water consumption charge plus a meter capacity fee as follows:
5/8" meter $2.00 per month
3/4" meter $2.00 per month
1" meter $3.34 per month
1 ½" meter $6.66 per month
2" meter $10.66 per month
3" meter $20.00 per month
4" meter $33.32 per month
6" meter $66.66 per month
Commercial Sewage Rates
First 100,000 gallons are the same as the residential rates
Excess of 100,000 gallons is $1.00/1,000 gallons
Residential Garbage Rates
Bag System $6.75/month plus $1.30 per 32 gallon bag
or plus $0.65 per 16 gallon bag
Commercial Garbage System
Inquire through the Business Office
Electric Underground Installation Charges
200 AMP Cable in an Underground Area $100.00 1st 100 feet
200 AMP Cable in an Overhead Area $130.00 1st 100 feet
Installation over 100 feet shall be charged $1.00 per foot for each foot over 100 feet.
400 AMP Cable in an Underground Area $210.00 1st 100 feet
400 AMP Cable in an Overhead Area $260.00 1st 100 feet
Installation over 100 feet shall be charged $2.00 per foot for each foot over 100 feet.
Other Fees or Charges
Street Lights $2.75/month
Bug Spray Fee $1.00/month
Minnesota State Water Fee $0.44/month
Storm Sewer $2.00/month