The organizational meeting of January 3, 2006 at 5:00 P.M. was called to order by the City Attorney, Ron Galstad.

Present:  Quirk, Ogden, Gregoire, Vetter

Absent :  None

 

The following nomination was made for the President of the Water, Light, Power and Building Commission:  Marilynn Ogden.

It was moved by Commissioner Gregoire second by Commissioner Vetter that the nominations for President now be closed and that a unanimous ballot be cast for Ms Ogden.

Voting Aye:  Quirk, Ogden, Gregoire, Vetter

Voting Nay:  None

 

The following nomination was made for the Vice-President of the Water, Light, Power and Building Commission:  Doug Gregoire.

It was moved by Commissioner Quirk second by Commissioner Ogden that the nominations for Vice-President now be closed and that a unanimous ballot be cast for Mr. Gregoire.

Voting Aye:  Quirk, Ogden, Gregoire, Vetter

Voting Nay:  None

 

It was moved by Commissioner Quirk second by Commissioner Vetter to adjourn the organizational meeting.

Voting Aye:  Quirk, Ogden, Gregoire, Vetter

Voting Nay:  None

 

The regular meeting of the Water, Light, Power, and Building Commission was now called to order by the newly elected president.

Present:  Ogden, Gregoire, Quirk, Vetter

Absent :  None

 

It was moved by Commissioner Quirk second by Commissioner Gregoire that the minutes of the previous meeting of December 20, 2005 be approved as read.

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

 

The following bills and payroll were recommended for approval:

 

CHECK  NO

VENDOR

DESCRIPTION

AMOUNT

27896

Acme Electric

Supplies

728.00

27897

APPA

Training & school

300.00

27898

Batteries Plus

Supplies

36.50

27899

Ben Franklin Crafts

Supplies

12.23

27900

James Beeman

Reimbursement

75.00

27901

Bert’s Truck Equipment

Supplies

8.65

27902

Border States Electric

Supplies

794.63

27903

Dan Boyce

Expenses

306.12

27904

Brady Martz & Assoc

Professional fees

4,300.00

27905

City of EGF

Transfer; rent

91,655.75

27906

Ethanol Products

Wtr treat chemicals

796.41

27907

Floan Sanders

Professional fees

2,201.00

27908

GF Thur-O-Clean

Contracted services

431.32

27909

Galstad Jensen & McCann

Nov legal fees

555.00

27910

GF Fire Equip Co

Supplies

83.07

27911

GF Welding

Supplies; repair

395.21

27912

Scott Gravseth

Reimbursement

580.85

27913

Graymont Western Canada

Wtr treat chemicals

2,767.92

27914

Hansen Ford

Maintenance

149.03

27915

Hawkins Inc

Wtr treat chemicals

214.02

27916

Hugo’s #5

Supplies

18.34

27917

Interstate Power Systems

Maintenance

1,743.70

27918

Johnson Insurance Consultant

Professional fees

1,450.06

27919

M & W Services Inc

Dec 16-31 meter reads

1,582.35

27920

Madison Nat’l Life Ins

Life insurance

248.85

27921

Meagher Construction LLC

Repairs

645.00

27922

Midwest Refrigeration

Repairs

400.00

27923

MN State Retirement System

Miscellaneous

6,898.81

27924

Network Center Inc

Supplies

340.46

27925

NW Serv CO-OP Wells Fargo

Health insurance

14,289.00

27926

Jeff Olson

Expenses

391.64

27927

Pest Detectives

Contracted services

159.76

27928

Pitney Bowes Inc

Maintenance contract

705.00

27929

Postmaster

Permits & fees

160.00

27930

PS Doors

Repairs

53.79

27931

SimplexGrinnell

Contracted services

635.81

27932

Water & Light

Utilities

12,158.82

27933

X-cel Energy

Gas utilities

7,529.67

 

 

Payroll

55,835.62

 

TOTAL

 

$211,637.39

 

It was moved by Commissioner Gregoire second by Commissioner Quirk that the bills and payroll be allowed as recommended and the Secretary issue checks for the same.

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

 

The meeting date for Step 2 of the Grievance process was set for 5:30 p.m. on Wednesday, January 11, 2006 in the City Hall training room. A closed Commission meeting will be held at 5:00 p.m. on that same day in the Water & Light conference room in City Hall.

 

Commissioner ­Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding water service to be known as WR-06 shall become effective with and the new rates applied on the bills rendered in February, 2006 commencing with the north end mailing on or about January 31, 2006 and

 

BE IT FURTHER RESOLVED that WR-06shall supersede and replace all prior water rates and the following shall compose WR-06

All usage will be billed @ $4.75 Per Thousand Gallons

 

Minimum Charge Based on Meter Size on Table Below:

                                                            5/8"                  Meter                $   7.00  Per Month

                                                            3/4"                  Meter                $   7.00  Per Month

                                                            1"                     Meter                $  11.25  Per Month

                                                            1½"                  Meter                $  22.50  Per Month

                                                            2"                     Meter                $  36.00  Per Month

                                                            3"                     Meter                $  67.50  Per Month

                                                            4"                     Meter                $ 111.25  Per Month

                                                            6"                     Meter                $ 225.00  Per Month

                                                            8"                     Meter                $ 352.00  Per Month

 

Any Meter Over 8" - Rate to be Determined by Department

 

BE IT FURTHER RESOLVED THAT a penalty of ten per cent (10%) of the current bill will be added to gallonage charge if not paid within ten (10) days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the Resolution passed.

 


Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February 2006, commencing with the North End mailing on or about January 31, 2006, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

COMMERCIAL GENERAL ELECTRIC RATE (COMMGEN-2006)

 

                                                Customer Charge                       $  9.75              Per Month

                                                All KWH Energy                                    $  0.06100         Per Month

                                                Minimum Charge                        $  9.75              Per Month

 

BE IT FURTHER RESOLVED that those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February 2006 commencing with the North End mailing on or about January 31, 2006 and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

GENERAL RESIDENTIAL COMBINATION RATE (GENCOMB-2006)

 

                                                Customer Charge           $   5.75             Per Month

                                                All KWH Energy                        $   0.06800        Per Month

                                                Minimum Charge            $   5.75             Per Month

 

BE IT FURTHER RESOLVED that this rate is available to single-phase residential customers; and those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that a penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 


Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February, 2006, commencing with the North End mailing on or about January 31, 2006 and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

GENERAL RESIDENTIAL ELECTRIC RATE (GRE-2006)

 

                                                Customer Charge                       $  7.75              Per Month

                                                All KWH Energy                                    $  0.06800         Per Month

                                                Minimum Charge                        $  7.75              Per Month

 

BE IT FURTHER RESOLVED that this rate is available to single-phase residential customers; and those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota, that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February, 2006 for January, 2006 service, commencing with the mailing on or about February 16, 2006, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

LARGE COMMERCIAL ELECTRIC RATE (LCER-2006)

Customer Charge

 $ 475.00  

Per Meter Per Month

 

Facility Charge

$ 925.00  

Per Month

 

KW Demand Charge

$   7.10  

Per 15 min kW

For winter demand

KW Demand Charge

$   9.20  

Per 15 min kW

For summer demand

KWH Energy Charge

$   0.02925

Per KWH

 

Power Factor Charge

0.001 

Per KVARH

 

Minimum Demand Charge

See below

 

 

 

Where winter season is the calendar months of January through May and October through December, and summer season is the calendar months of June through September.

 

BE IT FURTHER RESOLVED that this rate is available to three-phase commercial customers using 100,000 KWH, or more, in any month.  Any customer qualifying as a large commercial customer in any month shall remain on this rate for the next 11 months.  The customer's monthly billing KW demand will be the customer's 15 minute integrated KW demand, as measured and recorded, which occurs during the City's monthly system peak KW demand period. The customer's KWH energy will be the total KWH energy usage as measured and recorded on a monthly basis.  The customer is required to maintain a minimum power factor of 98 per cent lagging during peak load periods.  All reactive KVARH in excess of 20 per cent of the KWH energy, as measured and recorded on a monthly basis, will be billed at the rate per KVARH noted above.  The Minimum Demand Charge will be 50 per cent of the customer's monthly billing KW demand in the month of the city's seasonal peak KW demand, and

 

BE IT FURTHER RESOLVED that the above rates will apply on an annual basis and all power sold at retail is for the customer’s use in their East Grand Forks facility and is not eligible for resale, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

                                                                                                                    

BE IT FURTHER RESOLVED that the above rates will be subject to monthly adjustment based on the City's average cost of wholesale power. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the Resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February 2006, commencing with the North End mailing on or about January 31, 2006, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

MUNICIPAL GENERAL ELECTRIC RATE (MUNIGEN-2006)

 

                                                Customer Charge                       $  9.75              Per Month

                                                All KWH Energy                                    $  0.06800         Per Month

                                                Minimum Charge                        $  9.75              Per Month

 

BE IT FURTHER RESOLVED that those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding off peak electric service shall become effective with and new rates applied on the bills rendered in February 2006, commencing with the North End mailing on or about January 31, 2006, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

MUNICIPAL OFF PEAK RATE (MUNICIPALOFFPK-2006)

 

                                                            Customer Charge                       $  5.75              Per Month

                                                            All KWH Energy                                    $  0.03500         Per Month

                                                            Minimum Charge                        $  5.75              Per Month

 

BE IT FURTHER RESOLVED that those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding off peak electric service shall become effective with and new rates applied on the bills rendered in February, 2006, commencing with the North End mailing on or about January 31, 2006, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

OFF PEAK RATE (OPR-2006)

 

                                                Customer Charge                       $  5.75              Per Month

                                                All KWH Energy                                    $  0.03500         Per Month

                                                Minimum Charge                        $  5.75              Per Month

 

BE IT FURTHER RESOLVED that this rate is available to single-phase residential customers, and those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye: Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota, that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February 2006, commencing with the North End mailing on or about January 31, 2006, and

 

BE IT FURTHER RESOLVED that the following rates shall supersede all prior rates in this respective class:

RESIDENTIAL ALL ELECTRIC RATE (RAE-2006)

 

                                                Customer Charge                       $  7.75              Per Month

                                                All KWH Energy                                    $  0.06500         Per KWH

                                                Minimum Charge                        $  7.75              Per Month

 

BE IT FURTHER RESOLVED that this rate is available to single-phase residential customers, and those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED that a penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the Resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota that the following rate schedule regarding SEASONAL  LOAD CONTROLLED electric service shall become effective with and new rates applied on the bills rendered in February, 2006, commencing with the North End mailing on or about January 31, 2006, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

SEASONAL LOAD CONTROLLED RATE (SLCR-2006)

 

                                                Customer Charge                                   $  7.75              Per Month

                                                All heating season Energy                      $  0.03500         Per KWH

                                                All cooling season Energy                      $  0.06800         Per KWH

                                                Minimum Charge                                    $  7.75              Per Month

 

Where the heating season is defined as October through May and the cooling season is defined as June through September, and

 

BE IT FURTHER RESOLVED that this rate is available to those customers who have a separately metered ground or air source heat pump which provides primary winter season heating with automatic fossil fuel back up which is capable of providing primary replacement heating for the full duration of an off peak load control period, and that the heat pump system is connected to and capable of being controlled by the Commission’s load management system in both heating and cooling mode, and

 

BE IT FURTHER RESOLVED that the Water and Light Department reserves the right to  inspect the system to verify that it qualifies for this rate, and

 

BE IT FURTHER RESOLVED that the heat pump shall qualify for a $6.00 per month air conditioning load control credit for the months of June through September provided that the heat pump system functions as a central air conditioner and is connected to and capable of being controlled by the load management system, and

 

BE IT FURTHER RESOLVED that those customers who have an approved electrical water heater (40 gallon minimum) connected to the load management system shall have available to them a credit of $6.00 per month each month that their water heaters are connected to the system, and

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes, and

 

BE IT FURTHER RESOLVED  that the penalty of 10 per cent of the current billing will be added if not paid within 10 days from date of bill rendered.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the resolution passed.

 

Commissioner Gregoire, supported by Commissioner Quirk, introduced the following resolution and moved its adoption:

BE IT RESOLVED by the Water, Light, Power and Building Commission of the City of East Grand Forks, Minnesota, that the following rate schedule regarding electric service shall become effective with and new rates applied on the bills rendered in February, 2006 for January, 2006 service, commencing with the Industrial mailing on or about February 16, 2005, and

 

BE IT FURTHER RESOLVED that the following rate shall supersede all prior rates in this respective class:

INDUSTRIAL ELECTRIC RATE (IER-2006)

 

Customer Charge

  $  4,000.00

Per Account Per Month

For an industrial account with multiple meters on combined billing

Facilities Charge

  $ 20,000.00

Per Month

 

KW Demand Charge

         7.10

         9.20

Per KW

Per KW

For baseload winter demand

For baseload summer demand

KW Demand Charge

         7.65

Per KW

For annual winter demand exceeding baseload

KW Demand Charge

         9.95

Per KW

For annual summer demand  exceeding baseload

KWH Energy Charge

         0.0320

Per KWH

For baseload energy

KWH Energy Charge

         0.0385

Per KWH

For annual energy exceeding baseload

KWH Energy Credit

         0.02

Per KWH              

For annual energy below baseload

KWH City Franchise fee

         0.0075

Per KWH

For all energy per City franchise ordinance

Power Factor Charge

         0.001

Per KVARH

 

Minimum Demand Charge

See Below

 

 

 

Where winter season is the calendar months of January through May and October through December, and summer season is the calendar months of June through September.

 

BE IT FURTHER RESOLVED that this rate is available to three-phase commercial customers using 1,000,000 KWH, or more, in any month.  Any customer qualifying as an industrial customer in any month shall remain on this rate for the next 11 months.  The customer's monthly billing KW demand will be the customer's 15 minute integrated KW demand, as measured and recorded, which occurs coincident with the City's monthly system peak 15 minute KW demand period.  The customer's KWH energy will be the total KWH energy usage as measured and recorded on a monthly basis.  The customer is required to maintain a minimum power factor of 98 per cent lagging during peak load periods.  All reactive KVARH in excess of 20 per cent of the KWH energy, as measured and recorded on a monthly basis, will be billed at the rate per KVARH noted above.  The Minimum Demand Charge will be 50 per cent of the customer's monthly billing KW demand in the month of the customer's seasonal peak KW demand, and

 

BE IT FURTHER RESOLVED that the wholesale power adjustment clause applies to this rate. At the Department’s discretion, the above rate may be increased or decreased by 0.1 mill per KWH for each 0.1 mill, or major fraction thereof, by which the City's total average purchased power cost changes. All power sold at retail is for the customer’s use in their East Grand Forks facility and is not eligible for resale, and

 

BE IT FURTHER RESOLVED that the penalty of 10 per cent of current billing will be added if not paid within 10 days from date of bill rendered.

 

Avoided cost limitation

In no case will the credit issued for under purchases of demand or energy exceed the associated avoided wholesale power cost.

 

BE IT FURTHER RESOLVED that this energy rate shall include the current city electric franchise fee of $0.0075 per kWh and that the energy rate shall be subject to adjustment to reflect any changes in said city electric franchise fee, and

 

BE IT FURTHER RESOLVED that the rate for purchase of replacement demand and energy for industrial generator stand-by power for any duration of generation outage shall be governed by and priced according to separate individual stand-by contract agreements, and

 

BE IT FURTHER RESOLVED that the 2006 Industrial Rate as applied to American Crystal Sugar Company and set forth in a separate written schedule adopted by the Water, Light, Power and Building Commission shall hereby be adopted as an addendum to this general rate.

 

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

The President declared the Resolution passed.

 

It was moved by Commissioner Quirk second by Commissioner Gregoire that the meeting be adjourned to January 11, 2006 at 5:00 P.M.

Voting Aye:  Ogden, Gregoire, Quirk, Vetter

Voting Nay:  None

 

 

                                                                                                            Bonnie Abel

                                                                                                            Sec'y